Inside banner

Horton Wood 49.9MW

Wessex Solar Energy submitted a planning application to Sevenoaks District Council to construct and operate a 49.9 MW solar farm at a site near to Horton Kirby, Kent.

Planning permission was awarded for the project in February 2023.

The solar farm will consist of up to 134,000 solar panels.  The panels are placed on top of steel frames, which are piled into the ground in a similar fashion to a fencepost.  The panel ‘tables’ are positioned at an angle of between 20º and 35º from the ground and have a height of no more than 3.5m from the ground to the top of the panel table.

On average, the annual electricity produced from the project will be of the order of 60,000,000 kWh, enough to power over 16,000 homes.

Electricity will be exported to the regional electricity network via an existing on-site powerline connected to the local electricity network, operated by UK Power Networks.

We welcome enquiries from landowners, land agents and investors who may be interested in working with us. Get in touch now

Cookies notice

Our website uses cookies. By continuing to browse this website without changing your web-browser cookie settings, you are agreeing to our use of cookies. Check out more by reading our cookie guidelines.

Ok